Called while an object loads: once its BimMesh is made, before it is added to the scene (with
or without geometry, proxy null), then again each time a geometry of it is linked (its 3D, its
2D, proxy the one linked), before it is drawn. What it sets on the mesh (colour, opacity,
visibility, x-ray, layer, user data…) is its state from its first frame: set the material once a
geometry is there (proxy not null), the rest from the first call.
Called while an object loads: once its
BimMeshis made, before it is added to the scene (with or without geometry,proxynull), then again each time a geometry of it is linked (its 3D, its 2D,proxythe one linked), before it is drawn. What it sets on the mesh (colour, opacity, visibility, x-ray, layer, user data…) is its state from its first frame: set the material once a geometry is there (proxynot null), the rest from the first call.